The house is clean, and empty, and ready for wood floor staining!
They've started from the top floor down- here is the roof room and the first run of stairs.
The last pieces of stone slab are getting installed- here is the library fireplace.
One of the last pieces of
millwork is getting installed at the garden floor entry way. There will be a mirror and a bench behind that piece of plywood.
Our last recessed lights are going in at the family room.
The rear yard ipe fences are getting built and going up as well.