28 April 2010

stair rail and floors

Our stair railing is just about all installed and the floors throughout the house have all been stained.

Stairs and Rails:
Floors:
The rear garden is complete.
Lighting fixtures are going up throughout the house as well.

13 April 2010

nearing completion

The house is clean, and empty, and ready for wood floor staining!


They've started from the top floor down- here is the roof room and the first run of stairs.


The last pieces of stone slab are getting installed- here is the library fireplace.


One of the last pieces of millwork is getting installed at the garden floor entry way. There will be a mirror and a bench behind that piece of plywood.


Our last recessed lights are going in at the family room.

The rear yard ipe fences are getting built and going up as well.