Thanks so much for following construction of the townhouse. It's been a great project!
Showing posts with label stair. Show all posts
Showing posts with label stair. Show all posts
07 September 2010
25 May 2010
from the bottom up
kitchen range and hood installed
last bit of railing installed
pantry shelves getting installed
dining room completed (minus the lights)
library fireplace and cabinets installed and painted
fireplace trim detail
mechanical access doors (bead detail at perimeter to be installed soon)
the lovely stair rail (to be stained soon)
master bedroom hall with sconces installed
her glass shower enclosure
Labels:
areaway,
construction,
exterior photos,
finishes,
interiors,
millwork,
stair
28 April 2010
stair rail and floors
Our stair railing is just about all installed and the floors throughout the house have all been stained.
Stairs and Rails:
Stairs and Rails:
Floors:
The rear garden is complete.
Lighting fixtures are going up throughout the house as well.
Labels:
construction,
floor,
garden,
lighting,
stair
13 April 2010
nearing completion
The house is clean, and empty, and ready for wood floor staining!

Labels:
construction,
finishes,
floor,
garden,
interiors,
millwork,
stair,
stone and tile
26 February 2010
stone and wood
Interior finishes continue to progress in the townhouse. Look at that walnut column! It's only out for a photo op but it should be installed permanently in another month. You can also see the operable paneled ceiling and mechanical equipment above.

Our dining room plaster ceiling medallion has also arrived on site. This is only half of the oval but you can see it's quite lovely.
The front door is on site and ready to be installed along with it's surround and decorative panels and trim.
The stone slabs are all installed in the kitchen. Next come appliances.
Labels:
construction,
doors,
finishes,
interiors,
millwork,
slab work,
stair,
stone and tile
16 December 2009
more interior work
The interior of the townhouse continues to progress. Here is a view of the parlor floor foyer all framed out with it's door hung.

The library has all of it's full height millwork installed. The fireplace awaits its mantel and sheet rock.
The library has all of it's full height millwork installed. The fireplace awaits its mantel and sheet rock.
The garden floor millwork is partially installed. Her you can see a built in desk and the bar cabinet.
The two main rooms on the master bedroom floor both have paint colors up. Here is the sitting room...
... and here is the master bedroom itself.
The master dressing room millwork has also been installed. Look at those shoe drawers towards the door!
The stair risers are also getting their first coat of primer.
Outside the ipe deck has been laid at the rear garden. Plants and debris still need to be removed.
The newly repaired gas line is also in. This means we're not far away from our boiler running.
Subscribe to:
Posts (Atom)