Thanks so much for following construction of the townhouse. It's been a great project!
Showing posts with label garden. Show all posts
Showing posts with label garden. Show all posts
07 September 2010
28 April 2010
stair rail and floors
Our stair railing is just about all installed and the floors throughout the house have all been stained.
Stairs and Rails:
Stairs and Rails:
Floors:
The rear garden is complete.
Lighting fixtures are going up throughout the house as well.
Labels:
construction,
floor,
garden,
lighting,
stair
13 April 2010
nearing completion
The house is clean, and empty, and ready for wood floor staining!

Labels:
construction,
finishes,
floor,
garden,
interiors,
millwork,
stair,
stone and tile
26 March 2010
bathrooms and stone
The tub and faucets have been installed at her master bathroom!


Look at that great polished nickel finish! And that tub will be a dream to soak in. The chandelier that will be installed over it just arrived on site yesterday as well.
Vanity tops at the other bathrooms are all in as well


It's especially exciting to see this second stone as we were not that excited about the dark brown stone that originally went in. This one is perfect.
The library onyx hearth is in as well. The surround should be installed next week.

It's a little messy now but in a few days it will be stunning.
And progress throughout the rest of the house...

Walnut columns and stair rails are waiting in the library to be installed.

Our faux skylight frame is in.

The ipe deck at the top floor terrace has been completed (as has the ladder to the hvac roof above which is not visible).
Ipe wood waits to be turned into fencing.
The week after next will mark the beginning of finishing the wood floors throughout the apartment! Then things will really be coming together.


Look at that great polished nickel finish! And that tub will be a dream to soak in. The chandelier that will be installed over it just arrived on site yesterday as well.
Vanity tops at the other bathrooms are all in as well


It's especially exciting to see this second stone as we were not that excited about the dark brown stone that originally went in. This one is perfect.
The library onyx hearth is in as well. The surround should be installed next week.

It's a little messy now but in a few days it will be stunning.
And progress throughout the rest of the house...

Walnut columns and stair rails are waiting in the library to be installed.

Our faux skylight frame is in.

The ipe deck at the top floor terrace has been completed (as has the ladder to the hvac roof above which is not visible).
Ipe wood waits to be turned into fencing.The week after next will mark the beginning of finishing the wood floors throughout the apartment! Then things will really be coming together.
Labels:
construction,
finishes,
garden,
interiors,
millwork,
plumbing,
slab work,
stone and tile
10 February 2010
stone slabs
Work on the townhouse continues despite the crumby weather.

Our kitchen countertops are fabricated and on site. The veining and the colors are absolutely amazing. The stone is a quartzite which means that it is very hard and much more stain resistant than marble.


Our kitchen countertops are fabricated and on site. The veining and the colors are absolutely amazing. The stone is a quartzite which means that it is very hard and much more stain resistant than marble.
Labels:
construction,
exterior photos,
finishes,
garden,
interiors,
millwork,
slab work,
stone and tile
16 December 2009
more interior work
The interior of the townhouse continues to progress. Here is a view of the parlor floor foyer all framed out with it's door hung.

The library has all of it's full height millwork installed. The fireplace awaits its mantel and sheet rock.
The library has all of it's full height millwork installed. The fireplace awaits its mantel and sheet rock.
The garden floor millwork is partially installed. Her you can see a built in desk and the bar cabinet.
The two main rooms on the master bedroom floor both have paint colors up. Here is the sitting room...
... and here is the master bedroom itself.
The master dressing room millwork has also been installed. Look at those shoe drawers towards the door!
The stair risers are also getting their first coat of primer.
Outside the ipe deck has been laid at the rear garden. Plants and debris still need to be removed.
The newly repaired gas line is also in. This means we're not far away from our boiler running.
Subscribe to:
Posts (Atom)