25 May 2010

from the bottom up


kitchen range and hood installed


last bit of railing installed


pantry shelves getting installed


dining room completed (minus the lights)


library fireplace and cabinets installed and painted


fireplace trim detail


mechanical access doors (bead detail at perimeter to be installed soon)


the lovely stair rail (to be stained soon)


master bedroom hall with sconces installed


her glass shower enclosure

the top floor terrace
the top floor skylight

and an exterior shot of the rails installed along with one light

18 May 2010

finishes

More items are getting wrapped up over at the townhouse. Kitchen appliances are going in,


plumbing is nearing completion (this is at the laundry room),
floors await their final layer of polyurethane,
millwork is complete,

our faux skylight is in,


and the exterior fence is up.

05 May 2010

stone work and exteriors

Over the last few days more stone and tile work has been completed.





The backsplash has gone in at the kitchen and the entry foyer floor has been put down.

The glass shower doors have also been installed in one of the master bathrooms.


All exterior ipe work is just about complete. Here is the upper ipe fence that shields the mechanical units from view.

The areaway fence has also been installed. Next are the railings that lead down the stairs.


28 April 2010

stair rail and floors

Our stair railing is just about all installed and the floors throughout the house have all been stained.

Stairs and Rails:
Floors:
The rear garden is complete.
Lighting fixtures are going up throughout the house as well.

13 April 2010

nearing completion

The house is clean, and empty, and ready for wood floor staining!


They've started from the top floor down- here is the roof room and the first run of stairs.


The last pieces of stone slab are getting installed- here is the library fireplace.


One of the last pieces of millwork is getting installed at the garden floor entry way. There will be a mirror and a bench behind that piece of plywood.


Our last recessed lights are going in at the family room.

The rear yard ipe fences are getting built and going up as well.

26 March 2010

bathrooms and stone

The tub and faucets have been installed at her master bathroom!




Look at that great polished nickel finish! And that tub will be a dream to soak in. The chandelier that will be installed over it just arrived on site yesterday as well.

Vanity tops at the other bathrooms are all in as well




It's especially exciting to see this second stone as we were not that excited about the dark brown stone that originally went in. This one is perfect.

The library onyx hearth is in as well. The surround should be installed next week.


It's a little messy now but in a few days it will be stunning.

And progress throughout the rest of the house...


Walnut columns and stair rails are waiting in the library to be installed.


Our faux skylight frame is in.


The ipe deck at the top floor terrace has been completed (as has the ladder to the hvac roof above which is not visible).

Ipe wood waits to be turned into fencing.

The week after next will mark the beginning of finishing the wood floors throughout the apartment! Then things will really be coming together.