26 March 2010

bathrooms and stone

The tub and faucets have been installed at her master bathroom!




Look at that great polished nickel finish! And that tub will be a dream to soak in. The chandelier that will be installed over it just arrived on site yesterday as well.

Vanity tops at the other bathrooms are all in as well




It's especially exciting to see this second stone as we were not that excited about the dark brown stone that originally went in. This one is perfect.

The library onyx hearth is in as well. The surround should be installed next week.


It's a little messy now but in a few days it will be stunning.

And progress throughout the rest of the house...


Walnut columns and stair rails are waiting in the library to be installed.


Our faux skylight frame is in.


The ipe deck at the top floor terrace has been completed (as has the ladder to the hvac roof above which is not visible).

Ipe wood waits to be turned into fencing.

The week after next will mark the beginning of finishing the wood floors throughout the apartment! Then things will really be coming together.

16 March 2010

window guards

Almost all of the window guards have been installed at the house.




And here's what they look like from the inside.