25 May 2010

from the bottom up


kitchen range and hood installed


last bit of railing installed


pantry shelves getting installed


dining room completed (minus the lights)


library fireplace and cabinets installed and painted


fireplace trim detail


mechanical access doors (bead detail at perimeter to be installed soon)


the lovely stair rail (to be stained soon)


master bedroom hall with sconces installed


her glass shower enclosure

the top floor terrace
the top floor skylight

and an exterior shot of the rails installed along with one light

18 May 2010

finishes

More items are getting wrapped up over at the townhouse. Kitchen appliances are going in,


plumbing is nearing completion (this is at the laundry room),
floors await their final layer of polyurethane,
millwork is complete,

our faux skylight is in,


and the exterior fence is up.

05 May 2010

stone work and exteriors

Over the last few days more stone and tile work has been completed.





The backsplash has gone in at the kitchen and the entry foyer floor has been put down.

The glass shower doors have also been installed in one of the master bathrooms.


All exterior ipe work is just about complete. Here is the upper ipe fence that shields the mechanical units from view.

The areaway fence has also been installed. Next are the railings that lead down the stairs.