15 May 2009

exterior work

The townhouse is slowly getting stuccoed from the top down. Here you can see the new top floor and attic that rise above the neighboring houses.


The uneven color is due to the fact that the surfaces are still drying. Once the stucco over the cmu joints has dried the lines will no longer be visible.

What you can't see here is that our front cornice isn't installed- that's because about a third of it is sitting in the parlor floor.


It's hard to believe that this is the same holey, painted coated cornice that was sitting on the house about a year ago.

Here's a quick shot of the new exterior decorative tiles in context. They did such a great job setting them into the chimney as well.


And last but not least here is a depressing shot of what our rear garden looks like at the moment (yes, that's an old refrigerator!).

Soon, however, it will be paved and planted and have a floating ipe deck...

In the next few weeks we are expecting the majority of the remaining windows as well as a few runs of new stair.