28 January 2010

plumbing and finishes

The bathroom fixtures and fittings are going in throughout the house.







The top floor bathroom has it's shower fittings, toilet, and medicine cabinet in.



The master bath shower fittings are in as well.






The floors have all been sanded at the top floor of the townhouse and the storage closet is even getting its first few coats of stain.






Here is what are window grilles will most likely look like. They are on every floor at the front of the house.


The sprinkler line has also been connected at the house. A huge contraption for such a tiny mechanical room!

No comments: