Tale of a Townhouse

An indepth look at the renovation of a Manhattan townhouse

15 October 2008

drawings

What the site should look like in a little over a year...







sections, plans, and elevations
Posted by Studio Marchetti Architecture at 4:56 PM
Labels: drawings

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Visit Our Website

  • Studio Marchetti Architecture

Contact Us

Name

Email *

Message *

Resources

  • Complete Tile Collection
  • SA Baxter

Blog Archive

  • ►  2010 (15)
    • ►  September (1)
    • ►  May (3)
    • ►  April (2)
    • ►  March (2)
    • ►  February (3)
    • ►  January (4)
  • ►  2009 (30)
    • ►  December (3)
    • ►  November (2)
    • ►  October (3)
    • ►  September (2)
    • ►  August (5)
    • ►  July (3)
    • ►  June (3)
    • ►  May (4)
    • ►  April (1)
    • ►  March (3)
    • ►  January (1)
  • ▼  2008 (7)
    • ►  November (1)
    • ▼  October (4)
      • up and down
      • drawings
      • friday's site visit
      • construction
    • ►  September (2)

Labels

  • areaway
  • construction
  • cornice
  • demolition
  • doors
  • drawings
  • electric
  • elevator
  • existing conditions
  • exterior photos
  • finishes
  • floor
  • foundation work
  • garden
  • hardware
  • interiors
  • lighting
  • millwork
  • paint
  • plumbing
  • rear wall
  • slab work
  • stair
  • stone and tile
  • windows
Simple theme. Powered by Blogger.